Work-through tent structure Rhine Bridge

Work tents for renovation of the Karlsruhe Rhine bridge

Renovation space | Industrial application

Client

Strukton

 

Target client

During bridge-deck renovations, a tent structure was required to cover the entire bridge surface.

 

Information

The bridge-deck of the Rhine bridge, in Karlsruhe, Germany, was in need of renovations. Work had to be done on the entire bridge-deck, requiring a construction tent. By installing a construction tent, work could continue regardless of weather conditions, in a dry and frost-free environment. Work was completed without delays. We installed a custom tent structure measuring 18.5 by 335 meters.

Request a call